SECTION LINKS
  
Public Works
»  Division of Streets
»  Division of Urban Forestry
»  Division of Water Treatment
»  Division of Water Reclamation
Village Departments
»  Community Affairs
»  Construction Services
»  Development
»  Finance
»  Public Works
  HOME Residents Business Government Media Center Tourism
  weather site map
        
  Departments  »  Public Works  »  Water Reclamation    
Thursday, July 03, 2008
Assistance
»  Contact Information
»  Issue Reporting
»  Village Departments
 
Quick Links
»  Event Calendar
»  How to Pay
»  Information Sharing
»  Forms and Permits
»  Reports and Publications
»  Am I a Resident
»  Village Organizations
 
Website Search
 





Privacy & Security Statement

Copyright 2008 Village of Canal Winchester. All rights reserved.
Department Name: Water Reclamation Department
Mailing Address: 36 South High Street     Canal Winchester, Ohio 43110
Location: 400 Ashbrook Dr.     Canal Winchester, Ohio 43110
 
Water Reclamation Department Manager: Steve Smith
Email: ssmith@canalwinchesterohio.gov
Phone: 614.837.2254           
Fax: 614.837.1656
 
Description of Services
The Canal Winchester Division of Water Reclamation is dedicated to providing the citizens of Canal Winchester and the environment with the treatment and collection of wastewater in the most economical, safe and reliable manner in the present and for the future.

The Division of Water Reclamation has over 52 miles of sewer collection mains and more than 550 manholes throughout the village and the neighboring community of Pickerington. Eleven pump stations located at various locations in the village move sewage from lower to higher flow lines, ultimately gravity feeding the sewage to the village’s treatment facility located at the Public Works Complex on Ashbrook Rd. The nearby communities of Pickerington and Lithopolis have connections to the Canal Winchester sewer system as well, with Pickerington using two pump stations owned and maintained by Canal Winchester to deliver the sewage for treatment.

Canal Winchester’s original treatment facility was constructed in the 1930’s. A new facility was constructed in 1960 at its current location with an upgrade occurring in 1986 and again in 1998 to its present day capacity of 2.5 million gallons per day (MGD). The facility is a state-of-the-art conventional activated sludge treatment system that achieves over 96% pollutant removal. The process consists of primary pumping/degritting/screening and secondary treatment using Schreiber activated sludge technology. Ultraviolet disinfection completes the process prior to discharge into Walnut Creek.